Major Earthworks & Access Roads to Breaching Range
This project was the first of its kind for Antoun and opened many new opportunities with Defence Clients carrying out high-risk and complicated works. The project took place on 12,000m2 of the main artillery testing ground for explosive trials, creating a high risk of live explosives within the site. Prior to any excavation or construction, we were required to complete the clearance of Unexploded Ordnance (UXO).
Location:
Holsworthy, NSW
Budget:
$1m – $2m
Duration:
16 weeks
Service/ Products:
Sector:
Completed:
2014
The scope of works included
- Clearance of Unexploded Ordnance (UXO) prior to any excavation occurring
- Clearance of all vegetation
- Construction of new access roads to the breaching ranges
- Construction of a Heavy Breaching Range consisting of R.C. precast walls, steel sheet and steel ship hatches
- Construction of a Light Breaching Range consisted of industrial roller doors, reinforced core filled block walls and brick walls
- Construction of a permanent administration building, preparation shed, safety bunker, and explosives and detonator storage areas
The results
The completed works exceeded the expectations of the client and have since become a landmark project for future breaching ranges to be replicated interstate at other Defence facilities.
Play Video
Contact us to find out how we can help
Learn more about
what we do

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem ipsum dolor sit amet, consect. ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet — consectetur
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem ipsum dolor sit amet, consect. ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet — consectetur
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem ipsum dolor sit amet, consect. ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet — consectetur Related insights
CSA – the greener choice for concrete infrastructure
Read more
Government
Roads
Concrete MixCivil engineeringDelivery of ConcreteEarthworks and ExcavationDemolition