Antoun were engaged by Qantas to construct the wide body maintenance bay at the Sydney Jet Base, which needed to be durable enough to accommodate A380 aircraft. As these works impacted on the air-side security of the airport, they required curfew and security logistics to maintain the integrity of the airside security system during construction works.

Location:

Mascot, NSW

Budget:

$5m – $10m

Duration:

40 weeks

The scope of works included

  • Bulk earthworks and remediation of the site
  • Upgrade and installation of underground fuel tanks and stormwater catchment tanks
  • Construction of concrete pavement hardstand to accommodate A380 aircraft
  • Construction of a new LAME carpark, guardhouse, airside aircraft pavement, retaining walls and fencing
  • Diversion of Lancastrian Drive
  • Drainage, lighting and electrical services
  •  

The results

The project was completed on time and on budget in difficult operational conditions. The completed scope of works were delivered with no security incidents and minimal disruption to airport operations

Play Video

Contact us to find out how we can help

Learn more about
what we do

Relevant documents

Antoun NSW EMS certificate
2018-2021

RMS Prequalification letter &
Certificate expApr22.pdf

Antoun NSW EMS certificate
2018-2021

RMS Prequalification letter &
Certificate expApr22.pdf

Who we work with