Search

Yarramundi Road, Pavement and Services

Antoun was contracted to upgrade the road and drainage at Yarramundi Road, UWS Hawkesbury Campus, including road widening and kerbing, and regrading of swale drains.

Location:

WSU Richmond, NSW

Budget:

<$1m

Duration:

10 weeks

The scope of works included

  • Initial work required a redesign of existing stormwater drainage networks in areas directly affected by the proposed new road works and the appropriate redirection of these services
  • Surrounding swale channels were regraded and discharged into the existing stormwater drainage system to Vines Drive during excavation
  • Construction involved kerb widening on both sides of Yarramundi Road including laybacks as required for driveways and pathways, signage and re-sheeting of the
    existing road surface
  • Final works saw the installation of railings and concrete ramps to connecting buildings

The Results

To accommodate students, teachers and other pedestrians, work was completed in two stages to enable continuous access to buildings during construction. Antoun worked collaboratively with the client to ensure the project was completed in a timely and effective manner with minimal disruptions to the University.

Play Video

Contact us to find out how we can help

Learn more about
what we do

Relevant documents

Antoun NSW EMS certificate
2018-2021

RMS Prequalification letter &
Certificate expApr22.pdf

Antoun NSW EMS certificate
2018-2021

RMS Prequalification letter &
Certificate expApr22.pdf

Who we work with